What is the difference between the implementation phase and the maintenance phase quizlet?

Recommended textbook solutions

What is the difference between the implementation phase and the maintenance phase quizlet?

Numerical Analysis

9th EditionJ. Douglas Faires, Richard L. Burden

873 solutions

What is the difference between the implementation phase and the maintenance phase quizlet?

Book of Proof

2nd EditionRichard Hammack

340 solutions

What is the difference between the implementation phase and the maintenance phase quizlet?

Excursions in Modern Mathematics

8th EditionPeter Tannenbaum

983 solutions

What is the difference between the implementation phase and the maintenance phase quizlet?

Mathematical Applications for the Management, Life, and Social Sciences

11th EditionJames J. Reynolds, Ronald J. Harshbarger

5,082 solutions

owned by IBM - provides a framework for breaking down the development of software into four gates. Each gate consists of executable iterations of the software in development

1.inception - this phase includes inception of the business case. this phase ensures all stakeholders have a shared understanding of the system

2. elaboration - this phase provides a rough order of magnitude - primary questions answered in this phase deal with agreed-upon details of the system including the ability to provide an architecture to support and build the system

3.construction - this phase includes building and developing the product.

4. Transition - primary questions answered in this phase address ownership of the system and training of key personnel.

Upgrade to remove ads

Only ₩37,125/year

  1. Math

  • Flashcards

  • Learn

  • Test

  • Match

  • Flashcards

  • Learn

  • Test

  • Match

Terms in this set (34)

100 % rule

A rule requiring 100 percent planning of all tasks, including all of the internal, external, and interim tasks.

15 15 rule

A rule suggesting that if a project is more than 15 percent over budget or 15 percent off the planned schedule, it will likely never recoup the time or cost necessary to be considered successful. At this point a decision needs to be made on if or how to proceed from that point.

analysis phase

The phase of the SDLC involves a complete, detailed analysis of the systems needs of the end user as well as a proposed solution.

critical path

The longest path for a project and represents the minimum amount of time needed for the completion of the project when sufficient resources are allocated.

design phase

phase of the SDLC that involves describing in detail the desired features of the system that were uncovered in the analysis phase.

gantt chart

A graphical representation of the project schedule that maps the tasks to a project calendar.

implementation phase

The phase of the SDLC that involves development, testing, and implementation of the new proposed system.

maintenance phase

The final phase of the SDLC that includes making changes, corrections, additions, and upgrades (generally smaller in scope) to ensure the system continues to meet the business requirements that have been set out for it.

perceived ease of use

The extent to which a person perceives that the use of a particular system will be relatively free from effort.

perceived usefulness

The extent to which users believe the system will help them perform their job better.

planning phase

The phase of the SDLC that summarizes the business needs with a high-level view of the intended project.

PERT (Program Evaluation Review Technique)

A project management tool used to help
identify all tasks needed to complete a project. It is also helpful in determining task dependencies.

project

A series of tasks that are generally performed in a defined sequence to produce a predefined output.

project management

The process of carrying out the systems development life cycle to achieve an intended outcome.

project manager

The lead member of the project team who is responsible for the project.

project sponsor

Generally a senior executive in the company who takes responsibility for the
success of the project.

scope creep

The change in a project's scope after the project work has started.

systems analyst

Person responsible for both determining the information needs of the business and designing a system to meet those needs.

SDLC (Systems Development Life Cycle)

The process of creating or modifying information systems to meet the needs of its users. It serves as the foundation for all processes people use to develop such systems.

TAM (Technology Acceptance Model)

A model that predicts when users will adopt a new system to the extent they believe the system will help them perform their job better.

triple constraint

Three factors that constrain information technology and other projects: cost, scope, and time. Also known as Dempster's triangle.

WBS (Work Breakdown Structure)

The process of identifying all tasks needed to complete a project.

SDLC phases

1) planning phase
2) analysis phase
3) design phase
4) implementation phase
5) maintenance phase

principles of effective IT planning

1) alignment
2) relevant scope
3) relevant timeframe
4) benefits realization
5) achievability
6) measurable performance
7) reassessment
8) awareness
9) accountability
10) commitment

alignment

the planning phase should support and complement the business strategy of a firm.

relevant scope

the overall scope of the planning phase should be established to facilitate formulation of effective ways to address the business needs.

relevant timeframe

the appropriate planning horizon should be formulated that pro- vides both short- to medium-term deliverables as well as long-term alignment with the business strategy.

benefits realization

costs of implementation should be commensurate with the tangible and intangible benefits that are expected to be realized. The expected benefits should be bigger than the costs.

achievability

the planning phase should recognize the capability and capacity of the firm to deliver solutions within the stated planning timeframe.

measurable performance

the planning phase should provide a means to measure and monitor project performance and as a means of communicating success to both stake- holders inside and outside the firm.

reassessment

the plan should be periodically reassessed to ensure it is relevant to the evolving business strategy of the firm.

awareness

the resulting plan that comes out of the planning phase should be communicated widely.

accountability

identification of those responsible for implementing the plan should be explicitly clear.

commitment

management commitment to the plan's implementation should be clear and evident.

Sets with similar terms

ACTG 3P97 Ch 15 (Extra Terms)

22 terms

roszelle

chapter 15

19 terms

chuncheung

SDLC

18 terms

mjduke7777

AIS CH 15

16 terms

ehalph3

Other sets by this creator

Series 66 Cram Sheet

43 terms

brijesh_dadlani

S66 Flashcards

28 terms

brijesh_dadlani

Series 7 Quicksheet

114 terms

brijesh_dadlani

SIE Unit 32: Ongoing Expectations of Associated Pe…

19 terms

brijesh_dadlani

Verified questions

ADVANCED MATH

Determine whether the following arguments are inductive or deductive. If an argument is inductive, determine whether it is strong or weak. If it is deductive, determine whether it is valid or invalid. When a cook cannot recall the ingredients in a recipe, it is appropriate that she refresh her memory by consulting the recipe book. Similarly, when a student cannot recall the answers during a final exam, it is appropriate that she refresh her memory by consulting the textbook.

Verified answer

ADVANCED MATH

Suppose A is a set for which $|A|=100$. How many subsets of A have 5 elements? How many subsets have 10 elements? How many have 99 elements?

Verified answer

ADVANCED MATH

In a volleyball match, Jenny serves the volleyball at 14 m/s, from a height of 2.5 m above the court. The height of the ball in flight can be estimated using the equation $h = - 4.9 t ^ { 2 } + 14 t + 2.5$ where h is the height, in metres, and t is the time, in seconds, after she serves the ball. a) What is the maximum height of the volleyball above the court? When does this occur? Round answers to the nearest tenth. b) If a player on the other team contacts the ball at a height of 0.5 m above the court, how long does it take for the ball to reach her? Round to the nearest second.

Verified answer

ADVANCED MATH

Find as many even pseudoprimes to the base 2 that are the product of three primes as you can. Do you think that there are infinitely many?

Verified answer

Recommended textbook solutions

What is the difference between the implementation phase and the maintenance phase quizlet?

Book of Proof

2nd EditionRichard Hammack

340 solutions

What is the difference between the implementation phase and the maintenance phase quizlet?

Numerical Analysis

9th EditionJ. Douglas Faires, Richard L. Burden

873 solutions

What is the difference between the implementation phase and the maintenance phase quizlet?

组合数学

5th EditionRichard A. Brualdi

685 solutions

What is the difference between the implementation phase and the maintenance phase quizlet?

Elementary Number Theory

7th EditionDavid Burton

776 solutions

Other Quizlet sets

Consular Job Aid - Detained Citizens

33 terms

bahasaatfsi

UHS CH 2: HS and the all hazards umbrella

22 terms

adrianne_huynh4

18_The truth from the grave_vocabulary

23 terms

Tatyana_Dzhemula

Related questions

QUESTION

An online email account that you have prompts you to verify that your personal information is correct. This organization is practicing which aspect of PAPA?

15 answers

QUESTION

Compiling and storing information on customers

2 answers

QUESTION

[True/False] An information repository allows a business to store important information and documents that are accessed remotely by its stakeholders for free.

5 answers

QUESTION

A business intelligence tool that uses abstractions such as color and graphical images like instrument (gauges to allow executives to grasp business situations quickly as known as a:

8 answers

What is the difference between the implementation phase and the maintenance phase?

The maintenance phase monitors and adjusts new and existing systems; the implementation phase places new systems into operation.

What is the implementation phase in the SDLC quizlet?

What is the implementation phase in the SDLC? Involves placing the system into production so users can begin to perform actual business operations with the system.

What is the first task of the maintenance phase quizlet?

The maintenance phase starts the process all over again, which is why the process is considered a cycle. Explain the tasks performed during the system definition phase of the systems development life cycle. The first step is to define the goals and scope of the new information system.

Which of the following occurs when the scope of the project increases beyond its original intentions?

Scope creep occurs when the scope of the project increases beyond its original intentions. Adding additional features that were not part of the initial project definition is an example of scope creep.