What is the logical relationship that exists between the project tasks or between a project task and a milestone group of answer choices?

Nội dung chính

  • What is a kill switch quizlet?
  • What is a simple bar chart that lists project tasks vertically against the project's time frame listed horizontally multiple choice question?
  • What are quantifiable criteria that must be met for the project to be considered a success quizlet?
  • What are the three primary variables in any project quizlet?

Recommended textbook solutions

Numerical Analysis

9th EditionJ. Douglas Faires, Richard L. Burden

873 solutions

Complex Analysis: A First Course with Applications

3rd EditionDennis G. Zill, Patrick D. Shanahan

1,433 solutions

Elementary Number Theory

7th EditionDavid Burton

776 solutions

Advanced Engineering Mathematics

10th EditionErwin Kreyszig

4,134 solutions

Recommended textbook solutions

Advanced Engineering Mathematics

10th EditionErwin Kreyszig

4,134 solutions

Mathematical Proofs: A Transition to Advanced Mathematics

3rd EditionAlbert D. Polimeni, Gary Chartrand, Ping Zhang

999 solutions

Numerical Analysis

9th EditionJ. Douglas Faires, Richard L. Burden

873 solutions

Advanced Engineering Mathematics

10th EditionErwin Kreyszig

What is a kill switch quizlet?

kill switch. a trigger that enables a project manager to close the project before completion.

What is a simple bar chart that lists project tasks vertically against the project's time frame listed horizontally multiple choice question?

A Gantt chart is a simple bar chart that depicts project tasks against a calendar. In a Gantt chart, tasks are listed vertically and the project's time frame is listed horizontally. A Gantt chart works well for representing the project schedule. It also shows actual progress of tasks against the planned duration.

What are quantifiable criteria that must be met for the project to be considered a success quizlet?

Project objectives are quantifiable criteria that must be met for the project to be considered a success. Project constraints are specific factors that can limit cost estimating options.

What are the three primary variables in any project quizlet?

The triple constraint includes three interdependent variables - time, scope, and resources.

What is a logical relationship that exists between the project tasks or between a project task and a milestone?

The A Guide to the Project Management Body of Knowledge (PMBOK Guide) does not define the term dependency, but refers for this term to a logical relationship, which in turn is defined as dependency between two activities, or between an activity and a milestone.

What is the logical relationship that exists between the project tasks or between a project task and a milestone quizlet?

A dependency is a logical relationship that exists between the project tasks or between a project task and a milestone.

What is a graphical network model that depicts a project's tasks and the relationships between those tasks quizlet?

A PERT chart is a graphical network model that depicts a project's tasks and the relationships between those tasks.

What is a simple bar chart that lists project tasks vertically against the project's time frame listed horizontally?

A Gantt chart is a simple bar chart that depicts project tasks against a calendar. In a Gantt chart, tasks are listed vertically and the project's time frame is listed horizontally. A Gantt chart works well for representing the project schedule. It also shows actual progress of tasks against the planned duration.