Related Questions
Q61:
In sociotechnical design: A)separate sets of technical and social design solutions are developed and compared. B)ergonomic features of a system are considered to be the most important consideration. C)systems analysts with proven backgrounds in sociological concerns rate and compare a system's social and technical aspects. D)human needs are given more importance than technical needs. E)technical needs are given more importance than organizational needs.
Q62:
The differing background between users and information systems specialists is referred to as the: A)user expertise gap. B)information system specialist inefficiency. C)user-designer paradigm. D)user-designer expertise gap. E)user-designer communications gap.
Q63:
Which of the following best describes the relationship between system implementation and user involvement and management support? A)System implementation rarely benefits from user involvement. B)System implementation benefits from user support,but does not require management support. C)System implementation generally benefits from high levels of user involvement and management support. D)System implementation benefits from management support,but does not require user support. E)System implementation rarely benefits from management support.
Q64:
Which of the following types of projects have a higher likelihood of failure? A)Integration of a third-party automated payment system B)Replacement of middleware with web services for legacy application integration C)Very large-scale or complex systems projects D)Redesigning a user interface to an online investment site E)Building a web-based interface to an existing system
Q65:
Which of the following is an example of using an external integration tool? A)Creating a Gantt chart B)Including user representatives as active members of the project team C)Creating a PERT chart D)Using portfolio analysis E)Developing a scoring model
Q67:
Which of the following is an example of using an internal integration tool? A)Creating a Gantt chart B)Including user representatives as active members of the project team C)Creating PERT chart D)Holding frequent project team meetings E)Developing a scoring model
Q68:
Which of the following is not important when designing a new system to fit the organization? A)Job design B)Government regulatory compliance C)Health and safety D)Return on investment E)Ergonomics
Q69:
Which type of planning tool shows each task as a horizontal bar whose length is proportional to the time required to complete it? A)PERT chart B)Gantt chart C)Both a PERT chart and a Gannt chart D)Scoring model E)Portfolio analysis
Q70:
Which of the following is the most widely used project management software today? A)Vertabase B)IBM Project Guide C)Microsoft Project D)Microsoft Excel E)Zoho Projects
Q71:
External integration tools: A)enable a project to have sufficient technical support for project management and development. B)enable a project manager to properly document and monitor project plans. C)portray a project as a network diagram with numbered nodes representing project tasks. D)consist of ways to link the work of the implementation team with users at all organization levels. E)enable project team members to keep track of external costs of a project.