In order, what are the first three steps in BPM?
1. designing new processes, 2. analyzing existing processes, 3. identifying processes for change.
1. identifying processes for change, 2. analyzing existing processes, 3. designing the new process.
1. analyzing processes to change, 2. designing the new process, 3. measuring the optimized process.
1. analyzing existing processes, 2. identifying processes for change, 3. designing the new process.
1. identifying processes for change, 2. designing the new process, 3. implementing the new process.
The four kinds of structural organizational change enabled by IT, in order from least to most risky, are
rationalization, automation, reengineering, and paradigm shift.
paradigm shift, reengineering, rationalization, and automation.
rationalization, automation, reengineering, and redesigning.
automation, redesigning, restructuring, and paradigm shift.
automation, rationalization, redesigning, and paradigm shift.
As a technical project manager, you have decided to propose implementing a prototyping methodology for a small Web-based design project. What is the order of steps you will follow in this project?
Select the best prototype, define the requirements, and implement the prototype.
Identify user requirements, develop the prototype, use the prototype, revise and enhance the prototype.
Develop the prototype; use the prototype; revise and enhance the prototype.
Define the requirements, develop solutions, select the best prototype, and implement the prototype.
Define the requirements, develop the prototype, revise and enhance the prototype.