At a minimum, ___ illustrate the ___ constraints among activities
network diagrams
technical
A resource ___ plan illustrates the expected ___ of ___ by time period during the time span of the project.
requirements
utilization
resources
Resources cannot usually be hired on a day-to-day basis to meet ___ requirement, thus it is preferable to have a more ___ application of resources
fluctuating
uniform or level
Resource leveling or smoothing, levels the resources so that ___
they are applied as uniformly as possible without extending the project schedule beyond the required completion time
Activities can be delayed to the point where all their positive slack is used up, as any further delays would cause the project to ___
extend beyond the project completion time
When several activities need the same limited resource at the same time, the activities with ___
the least slack have first priority
Information systems development includes ___ resources as the five basic required resources
people, hardware, software, data, and network
Network resources are composed of ___
communications media and network support
The more accurately the ___ are assessed for the needed ___, the more likely it is that the development projects can be completed on time
activities
resources
A ___ system can provide excellent features for handling resource considerations; most systems allow you to ___ a list of resources that be accessed by all of the tasks within a project
project management
create and maintain
___ assist with the complexity of generating a resource-leveled schedule and resource requirements, graphs, and tables
project management information systems
In resource-limited scheduling, the lower priority activities get delayed. The delaying of activities ___
may delay the project
To resolve any conflicts or to level, or smooth, the resources, the information systems typically provide two options, the first is to correct the system ___ and the other option is to allow the system to ___ correct the process
manually
automatically
___ is a method for developing the shortest schedule when the quantity of available resources is ___
Resource-limited scheduling
fixed
Resource-limited scheduling is an iterative method in which ___ are allocated to activities based on the ___
resources
least slack
___ can constrain the project schedule because the quantities of various types of resources available to perform the project activities may be ___
resources
limited
Using the resource requirements plan, it is necessary to estimate the ___ of resources required to perform each activity
types and quantities
The information systems typically inform the user if any resources have ___ or if any resources are ___ within a project
time conflicts
over allocated
Sets with similar termsSuccessful Project Management: Chapter 6
13 terms
brice_bader
Chapter 3
17 terms
kimberlymae07
Project Management Ch. 8
28 terms
gamlirefur
SCM final (chapter 3)
19 terms
Lexi_05
Sets found in the same folderMgmt 444 Ch20
20 terms
ivan_huang5
Mgmt 444 Ch. 2
20 terms
ivan_huang5
Mgmt 444 Ch. 3
20 terms
ivan_huang5
Mgmt 444 Ch. 4
20 terms
ivan_huang5
Other sets by this creatorMgmt 449 Final
72 terms
ivan_huang5
Mgmt 443 Managing Conflict
14 terms
ivan_huang5
Mgmt 443 Leading Positive Change
10 terms
ivan_huang5
Mgmt 443 Empowering & Engaging Others
11 terms
ivan_huang5
Verified questions
ADVANCED MATH
Determine which of the following passages are arguments. For those that are, identify the conclusion. For those that are not, determine the kind of nonargument. A mammal is a vertebrate animal that nurses its offspring. Thus, cats and dogs are mammals, as are sheep, monkeys, rabbits, and bears.
Verified answer
ADVANCED MATH
Death Valley, California, has the lowest elevation in the United States. Its elevation is 282 feet below sea level. Mount McKinley, Alaska, has the highest elevation in the United States. Its elevation is 20,320 feet above sea level. Use integers to describe these two locations in the United States.
Verified answer
ADVANCED MATH
For the Giapetto problem, show how the basic feasible solutions to the LP in standard form correspond to the extreme points of the feasible region.
Verified answer
ADVANCED MATH
Fill in the blanks with “necessary” or “sufficient” to make the following statements true. After the blanks have been filled in, express the result in terms of conditional statements. Stepping on a cat’s tail is a ________ condition for making the cat yowl.
Verified answer
Other Quizlet setsPOLISCI EXAM 2
51 terms
quizlette581346
Perry and Potter Chapter 46 Urinary Elimination qu…
15 terms
Tracy_Boss1TEACHER
Ch 13: Assertiveness Training
35 terms
Obellega
AIS EXAM 3
10 terms
Madelynsw
Related questions
QUESTION
Businesses invest in information systems for a number of reasons. Of those listed, which one is NOT essential enough for a business to make the costly investment in an information system?
3 answers
QUESTION
There will most likely be a fall in the use of mobile devices at work in the next 10 years.
15 answers
QUESTION
Why should you consider the storage formats that already exist in an organization when deciding upon a storage format for a new system?
9 answers
QUESTION
(T/F)There is virtually no kind of work that could not be managed best using project management
2 answers