Can constrain the project schedule because the quantities of various types of resources available to perform the project activities may be?

Scheduled maintenance: Saturday, September 10 from 11PM to 12AM PDT

Home

Subjects

Expert solutions

Create

Log in

Sign up

Upgrade to remove ads

Only ₩37,125/year

  • Flashcards

  • Learn

  • Test

  • Match

  • Flashcards

  • Learn

  • Test

  • Match

Terms in this set (18)

At a minimum, ___ illustrate the ___ constraints among activities

network diagrams

technical

A resource ___ plan illustrates the expected ___ of ___ by time period during the time span of the project.

requirements

utilization

resources

Resources cannot usually be hired on a day-to-day basis to meet ___ requirement, thus it is preferable to have a more ___ application of resources

fluctuating

uniform or level

Resource leveling or smoothing, levels the resources so that ___

they are applied as uniformly as possible without extending the project schedule beyond the required completion time

Activities can be delayed to the point where all their positive slack is used up, as any further delays would cause the project to ___

extend beyond the project completion time

When several activities need the same limited resource at the same time, the activities with ___

the least slack have first priority

Information systems development includes ___ resources as the five basic required resources

people, hardware, software, data, and network

Network resources are composed of ___

communications media and network support

The more accurately the ___ are assessed for the needed ___, the more likely it is that the development projects can be completed on time

activities

resources

A ___ system can provide excellent features for handling resource considerations; most systems allow you to ___ a list of resources that be accessed by all of the tasks within a project

project management

create and maintain

___ assist with the complexity of generating a resource-leveled schedule and resource requirements, graphs, and tables

project management information systems

In resource-limited scheduling, the lower priority activities get delayed. The delaying of activities ___

may delay the project

To resolve any conflicts or to level, or smooth, the resources, the information systems typically provide two options, the first is to correct the system ___ and the other option is to allow the system to ___ correct the process

manually

automatically

___ is a method for developing the shortest schedule when the quantity of available resources is ___

Resource-limited scheduling

fixed

Resource-limited scheduling is an iterative method in which ___ are allocated to activities based on the ___

resources

least slack

___ can constrain the project schedule because the quantities of various types of resources available to perform the project activities may be ___

resources

limited

Using the resource requirements plan, it is necessary to estimate the ___ of resources required to perform each activity

types and quantities

The information systems typically inform the user if any resources have ___ or if any resources are ___ within a project

time conflicts

over allocated

Sets with similar terms

Successful Project Management: Chapter 6

13 terms

brice_bader

Chapter 3

17 terms

kimberlymae07

Project Management Ch. 8

28 terms

gamlirefur

SCM final (chapter 3)

19 terms

Lexi_05

Sets found in the same folder

Mgmt 444 Ch20

20 terms

ivan_huang5

Mgmt 444 Ch. 2

20 terms

ivan_huang5

Mgmt 444 Ch. 3

20 terms

ivan_huang5

Mgmt 444 Ch. 4

20 terms

ivan_huang5

Other sets by this creator

Mgmt 449 Final

72 terms

ivan_huang5

Mgmt 443 Managing Conflict

14 terms

ivan_huang5

Mgmt 443 Leading Positive Change

10 terms

ivan_huang5

Mgmt 443 Empowering & Engaging Others

11 terms

ivan_huang5

Verified questions

ADVANCED MATH

Determine which of the following passages are arguments. For those that are, identify the conclusion. For those that are not, determine the kind of nonargument. A mammal is a vertebrate animal that nurses its offspring. Thus, cats and dogs are mammals, as are sheep, monkeys, rabbits, and bears.

Verified answer

ADVANCED MATH

Death Valley, California, has the lowest elevation in the United States. Its elevation is 282 feet below sea level. Mount McKinley, Alaska, has the highest elevation in the United States. Its elevation is 20,320 feet above sea level. Use integers to describe these two locations in the United States.

Verified answer

ADVANCED MATH

For the Giapetto problem, show how the basic feasible solutions to the LP in standard form correspond to the extreme points of the feasible region.

Verified answer

ADVANCED MATH

Fill in the blanks with “necessary” or “sufficient” to make the following statements true. After the blanks have been filled in, express the result in terms of conditional statements. Stepping on a cat’s tail is a ________ condition for making the cat yowl.

Verified answer

Other Quizlet sets

POLISCI EXAM 2

51 terms

quizlette581346

Perry and Potter Chapter 46 Urinary Elimination qu…

15 terms

Tracy_Boss1TEACHER

Ch 13: Assertiveness Training

35 terms

Obellega

AIS EXAM 3

10 terms

Madelynsw

Related questions

QUESTION

Businesses invest in information systems for a number of reasons. Of those listed, which one is NOT essential enough for a business to make the costly investment in an information system?

3 answers

QUESTION

There will most likely be a fall in the use of mobile devices at work in the next 10 years.

15 answers

QUESTION

Why should you consider the storage formats that already exist in an organization when deciding upon a storage format for a new system?

9 answers

QUESTION

(T/F)There is virtually no kind of work that could not be managed best using project management

2 answers

zusammenhängende Posts

Toplist

Neuester Beitrag

Stichworte